Daikin Emura RXJ20A5V1B Service Manual page 128

Split 3 r32
Hide thumbs Also See for Emura RXJ20A5V1B:
Table of Contents

Advertisement

4
|
Components
To check the wiring of the main PCB
To check the fuse of the main PCB
Service manual
128
Prerequisite: First perform all earlier main PCB checks, see
4
procedures" [
 126].
Prerequisite: Stop the unit operation via the user interface.
1 Turn OFF the respective circuit breaker.
2 Check that all wires are properly connected and that all connectors are fully
plugged‑in.
3 Check that no connectors or wires are damaged.
4 Check that the wiring corresponds with the wiring diagram, see
4
diagram" [
 199].
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Yes
No
Prerequisite: First perform all earlier main PCB checks, see
4
procedures" [
 126].
1 Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
c
a
a Fuse F1U
b Fuse F2U
c Fuse F3U
Blown fuse on the main PCB?
Yes
No
Action
No further actions required.
Return to
"Checking
4
procedures" [
 126] of the PCB and
continue with the next procedure.
b
Action
Replace the main PCB, see
4
procedures" [
 131].
Return to
"Checking
4
procedures" [
 126] of the main PCB
and continue with the next procedure.
RXJ20~50A + FTXJ-A(W)(S)(B)
"Checking
"7.2  Wiring
"Checking
"Repair
Split Emura 3 R32
ESIE22-04B – 2022.08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents