IBM xSeries 380 Hardware Maintenance Manual page 208

Table of Contents

Advertisement

12. Loosen the two captive screws ( 2 ) that hold the plastic shield ( 1 ) over the I/O
13. Remove the plastic shield.
14. Disconnect the PCI LED cable ( 3 ) and T-docking board interface cable ( 4 )
15. Use the two extraction/installation levers on the sides of the I/O Baseboard to
16. Once loose, slide the I/O Baseboard in the direction of the levers against the
17. Lift the connector end out of the chassis first ( 1 ), then lift the rest of the I/O
18. Place on a clean ESD-protected work surface. Remove the nine screws ( 2 ) and
198
Hardware Maintenance Manual: xSer ies 380
Baseboard. These screws also secure the baseboard tray to the server chassis.
from the I/O Baseboard.
pull it clear of the connector on the Sideplane ( 1 ).
chassis frame.
Baseboard out of the chassis.
the two hex jackscrews that secure the video connector ( 3 ) from the I/O
Baseboard to separate it from the I/O Baseboard tray.
A

Advertisement

Table of Contents
loading

Table of Contents