1-2. Installation Flowchart
Start
Confirmation before starting
system configuration
Determination of overall configuration
Designing of base and back frame
Preparation for all necessary
equipment
Installation of display unit
Connection
Settings and adjustments
End
1-8 (E)
Planning schedule
Prior confirmation of environment
- Temperature, humidity, dust, poisonous gas, floor load
bearing, power, etc.
- Ensuring of safety in consideration of installation work and
serviceability, operator's skill level, ensuring of doorway for
service personnel, etc.
Determination of array size and video wall structure
(Layout, frame structure, etc.)
Number of display units, display controllers, video wall
peripherals, IT system, etc.
Designing of electric system and video
wall display system (AV/IT system)