Job Aid: Replacing the Avaya S8500/B/C server

Replacing the cover on the replacement S8500 server

For these steps, see
page
24.
1. Place the cover onto the replacement S8500 server.
2. Slide the cover forward so the covers' tabs slide into place under the top slots of the front
panel.
3. Finger-tighten the captive screws on the back of the server.

Installing the replacement S8500 server in the rack

Note:
This procedure is for the S8500 server.
Note:
The following steps install the server in the rack.
1. Install the server onto the slide rails in the rack.
2. Locate the marked cable that you removed from the NIC (if used) and plug it into the NIC.
3. Connect the USB modem cable.
4. Connect the LAN connection (if used) to the Ethernet port on the RSA.
5. Connect the serial modem to the RS-232 port on the RSA.
6. Connect the power cord to the RSA.
7. Connect the power cord to the back of the server.
8. Push back into place.
See Quick Start for Hardware Installation: Avaya S8500 server for more information on installing
the S8500 server in the rack and reconnecting all the cables.

Checking for network activity on the S8500

To check for network activity look at the LEDs by each of the network ports as shown in
Figure
5:
1. After the server is back in service, check the LEDs for network activity on:
Services and/or customer network (Notes 7 and 8 in
l
Optional dual NIC card (Note 14 in
l
32 Job Aids for Field Replacements (FRUs) for the Avaya S8500 Server
Figure 1: Removing and replacing the cover on the S8500 server on
Figure
Figure
5)
5)

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8500bS8500c

Table of Contents