Installing The Switch In An Equipment Rack - Avaya Virtual Services Platform 8200 Installation Job Aid

Hide thumbs Also See for Virtual Services Platform 8200:
Table of Contents

Advertisement

Table 7: DC power specifications
Input Current:
Input Voltage (rms):
Power Consumption:
Temperature:
Inrush Current:
Turn on Condition:
Important:
12 V output rise time, from 10 to 90 percent, must be the maximum of 70 ms and monotonic under all
defined input and output conditions.
Efficiency:

Installing the switch in an equipment rack

This procedure describes how to install the switch using the supplied brackets on a two-post or four-
post equipment rack. The brackets secure the chassis and prevent it from sliding around during
vibration or when inserting or extracting transceivers.
• If you have a two-post rack, install the brackets in the mid-chassis position.
• If you have a four-post rack, install the brackets in the front chassis position. In the front
position, the switch should rest on a customer-supplied tray or shelf.
Caution:
Do not mount the chassis with brackets in the front position without using a tray under the
chassis. The chassis weight will cause damage to a rack when mounted by the front panel,
especially in an environment with vibration or in an earthquake prone area.
Procedure
1. Disconnect the power cord from the switch.
2. Attach a bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
June 2015
8284XSQ-DC
40.5V/24A to 60V/16A
40.5 to 60 VDC
800 W maximum
Operating range: 0 to 50 ºC
Non-operating range: -40 to 70 ºC
50 A maximum
500 milliseconds maximum after application of DC
power
• 88% minimum at 100% load level
• 92% minimum at 50% load level
• 88% minimum at 20% load level
• 80% minimum at 10% load level
Installation Job Aid for Avaya Virtual Services Platform 8200
11