Avaya S8800 Installing Manual

Avaya S8800 Installing Manual

Server for modular messaging
Hide thumbs Also See for S8800:

Advertisement

Quick Links

Installing the Avaya S8800 Server for
Modular Messaging
October 2009

Advertisement

Table of Contents
loading

Summary of Contents for Avaya S8800

  • Page 1 Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 2 Information identifying Third Party Components and the Third Party releases. Terms that apply to them is available on the Avaya Support Web site: http://www.avaya.com/support/ThirdPartyLicense/ For full support, please see the complete document, Avaya Support Notices for Hardware Documentation, document number 03–600759.
  • Page 3: Table Of Contents

    Connecting the MAS and MSS with an Ethernet switch................19 Single Server Corporate LAN connection....................20 Turning on the server............................21 Troubleshooting the hardware installation......................21 Avaya and customer equipment is missing....................21 The server has no power........................22 Index............................23 Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 4 Contents Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 5: Chapter 1: S8800 Introduction

    Chapter 1: S8800 introduction Introduction The S8800 Server supports several Avaya software applications. The server is available in a 1U model with various hardware components. The server model and specific hardware components in your server depends on the requirements of the software application that will run on the server.
  • Page 6: Back Of Server

    PCIe slot 1 (used for optional Ethernet connectors 5 and 6) Ethernet activity LED Ethernet link LED Video connector Not applicable to Modular Messaging Not applicable to Modular Messaging AC power LED (green) Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 7: Server Specifications

    The sound levels were measured in controlled acoustical environments according to the procedures specified by the American National Standards Institute (ANSI) S12.10 and ISO 7779 and are reported in accordance with ISO 9296. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 8: Server Components

    • Systems management Ethernet (IMM) Server components Component Minimum specification Upgrade options based on product requirements Microprocessor One Intel E5520 quad core, • One additional 2.26 GHZ processor E5520 processor for Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 9 • Slot 2 supports full- height, half-length cards Hot-swap fans No additional options Power supply One 675W, 12V AC power Redundant 675W, 12V AC supply power supply Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 10: Environmental Requirements

    10 to 32º C (50 to 90º F) at altitude of 914.4 m to 2,133 m (3,000 to 7,000 feet) Server off 10°C to 43°C 2,133 m 8% to 80% (50.0°F to 109.4°F) (7,000 feet) Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 11: Chapter 2: Installing The S8800 Server

    • Cable management arm stop bracket • Cable management arm mounting bracket • Cable management support arm • Two 10–32 screws • Four M6 screws • Five small cable ties Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 12: Safety Instructions

    - Install the server only in a rack cabinet with perforated doors. - Do not leave open spaces above or below an installed server in your rack cabinet. To help prevent damage to server components, always install a Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 13: Server Installation Checklist

    Remove the cabinet doors, if See the cabinet manufacturer's necessary. documentation. Attaching rails to the rack page 14 Installing the server in the rack on page 15 Install the cable management arm (optional) Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 14: Attaching Rails To The Rack

    The slide rails that come with the server are compatible with racks that have square holes. If you are installing the server in a rack that has round holes, Avaya recommends that you use the appropriate rails or shelf to ensure proper fit. The customer must provide the appropriate rails or shelf.
  • Page 15: Installing The Server In The Rack

    8. Make sure that each front latch is fully engaged. Next steps Install the server in the rack. Installing the server in the rack Prerequisites Attach rails to the rack. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 16 8. Insert the optional M6 screws (8) in the front of the server when you move the rack cabinet or if you install the rack cabinet in a vibration-prone area. See the following figure. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 17: Corporate And Private Lan Connections

    • For a Microsoft Exchange or an IBM Domino configuration, connect each MAS to the corporate LAN. • For an Avaya MSS configuration, connect the MSS to all Avaya MAS units and, if present, the supplementary server through a private LAN. If the Modular Messaging system consists of the MSS and a single MAS, you can use a crossover cable to make the private LAN connection.
  • Page 18: Connecting The Mas To The Corporate Lan

    Private LAN for Modular Messaging 1. With the crossover cable connect the MAS to the MSS. 2. Connect each server, as needed, to the corporate LAN with a standard Ethernet cable. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 19: Connecting The Mas And Mss With An Ethernet Switch

    1. Connect the Private LAN connection on the MSS and each MAS to the Ethernet switch. 2. Connect each server, as needed, to the corporate LAN with a standard Ethernet cable. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 20: Single Server Corporate Lan Connection

    Single Server Corporate LAN connection System Platform enables you to run applications that require dedicated servers on a single server platform. Ethernet interface for the corporate LAN Ethernet cable to the corporate LAN Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 21: Turning On The Server

    The power-on LED will stop blinking and stay lit. After you press the power button, the server takes approximately five minutes to initialize. Important: Avaya recommends that users not change the default uEFI/BIOS settings. Next steps See the specific product documentation for information on installing the operating system and software.
  • Page 22: The Server Has No Power

    Turning on the server on page • Check the power supply LEDs on the back of the server. During normal operation, the AC LED and DC LED are both lit. Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 23: Index

    ..........safety instructions ............server components ............dimensions ............. installation checklist front view ............... server ..............installing in rack ........... specifications ............turning on ............. weight ..............LAN ................Installing the Avaya S8800 Server for Modular Messaging October 2009...
  • Page 24 Index temperature requirements .......... troubleshooting video controller missing equipment ..........specifications ............power problems ........... turning on server ............Installing the Avaya S8800 Server for Modular Messaging October 2009...

Table of Contents