Testing the lift Circuit–Relief Valve (SVRV) Pressure (5610-D)
g216147
Test Procedure
Hydraulic System: Testing the Hydraulic System
Perform the lift relief valve (SVRV) pressure test to ensure that the lift circuit
relief pressure is correct.
1. Ensure that the hydraulic fluid is at normal operating temperature by
operating the machine for at least 10 minutes.
2. Park the machine on a level surface with the reel engage switch off, lower the
cutting units, shut off the engine, mow speed limiter is in the M
and set the parking brake.
3. Read all Warning, Cautions, and precautions listed at the beginning of this
section.
Figure 136
Page 6–136
position,
OW
Reelmaster
®
5410/5510/5610 Series
15216SL Rev C