Lift Cylinder - Toro Reelmaster 5410 Series Service Manual

Models with infocenter display
Hide thumbs Also See for Reelmaster 5410 Series:
Table of Contents

Advertisement

Lift Cylinder

g216673
1.
Cylinder pin
2.
Lift cylinder
3.
Carriage screw
4.
Retaining ring (2 each)
5.
Thrust washer (2 each) 10.
Removing the Lift Cylinder
Hydraulic System: Service and Repairs
6.
Cylinder slide pin
7.
#4 lift arm
8.
Hydraulic hose
9.
Hydraulic hose
90° hydraulic fitting
(2 each)
Note: The procedure for lift cylinder removal and installation is the same for
all Reelmaster 5010 series lift cylinders.
the left, front #4 cutting unit.
1. Park the machine on a level surface, lower the cutting units, shut off the
engine, set the parking brake, and remove the key from the key switch.
2. Read the
General Precautions for Removing and Installing the Hydraulic
System Components (page
3. If the lift cylinder for outside front cutting units (#4 or #5) is being removed,
remove the flange nut (item 13 in
the R-clamp to the lift cylinder.
Figure 182
11.
O-ring (2 each)
12.
O-ring (2 each)
13.
Flange nut
14.
R-clamp
15.
Flange-head screw
Figure 182
6–145).
Figure
182) and carriage screw that secure
Page 6–216
16.
Flat washer
17.
Bolt
18.
Locknut
shows the lift cylinder for
Reelmaster
®
5410/5510/5610 Series
15216SL Rev C

Advertisement

Table of Contents
loading

Table of Contents