Preparing for installation
What to do if components are missing or damaged
you observe any damage
components have become loose
you are satisfied that the 201i server has
arrived at your site undamaged
What is next?
Review the
Switch and network requirements
Introduction
The information in this section will help you plan your 201i server installation.
Meridian 1 or Communication Server 1000 slot requirements
The 201i server occupies two physical and electrical slots.
Note:
You can place the unit in Slot 9 of an Option11C as the unit can function from slots 9 and
10. Do not place the unit in slot 10. Even though the unit can physically fit, there is no
electrical connection on the backplane to slot 11.
®
34
Avaya CallPilot
201i Server Hardware Installation
IF
Switch and network requirements
THEN
contact your Avaya technical support
representative.
secure them.
If necessary, refer to the procedures in the
CallPilot <server model> Server Maintenance
and Diagnostics guide for your server.
you are ready to proceed with installation.
on page 34.
December 2010