Ricoh FT8680 Service Manual page 164

Table of Contents

Advertisement

31 July 1995
3. INSTALLATION PROCEDURE (COPIER)
[A]
[A]
[G]
[H]
N
CAUTION:
While the leveling shoes are not installed, do not completely pull out
many units simultaneously. Otherwise, the machine could topple.
NOTE: Keep the shipping retainers after installing the machine. They will be
reused if in the future the machine is transported to another location.
Proper reinstallation of the shipping retainers is required in order to
avoid any transport damage.
1. Remove the strips of the filament tape [A].
2. Open the left and right front doors [B, C] and remove the strips of filament
tape [D]. Remove the styrofoam blocks [E] and the cushion [F].
3. Remove the left vertical transport fixing bracket [G] (1 screw), pull out the
left vertical transport unit, and install the left lower inner cover [H] (2
screws).
4. Remove the tray fixing bracket [I] (1 screw) and reinstall the removed
screw [J] on the 3rd tray cover.
INSTALLATION PROCEDURE (COPIER)
[A]
[D]
A171I500.wmf
[B]
A171I514.wmf
3-5
[F]
[C]
[E]
[J]
[I]
A171I502.wmf

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents