Siemens SIMOTICS L-1FN3 Configuration Manual page 119

Linear motors peak and continuous load motors
Hide thumbs Also See for SIMOTICS L-1FN3:
Table of Contents

Advertisement

Specifying the total length of the secondary section track
The total length of a secondary section track determines the number of required secondary
sections. It depends on the length of the desired traversing distance, the number of primary
sections on this secondary section track and, if applicable, the use of a Hall sensor box.
The calculation of the total length of the secondary section track specified here guarantees
the maximum motor force over the entire traversing distance.
An individual primary section on the secondary section track
If it is intended that only one primary section should be on the secondary section track, the
length of the secondary section track is calculated using the length of the required traversing
distance and the magnetically active length of the primary section (see the image below).
Note
The magnetically active length of the primary section without the use of a Hall sensor box
(l
P,AKT
The variable l
the drawings for the attachment of the Hall sensor box.
Figure 5-10
1FN3 linear motors
Configuration Manual, 10/2018, 6SN1197-0AB86-0BP2
) is shorter than when a Hall sensor box is used (l
is specified in the dimension drawings. The length l
P,AKT
Determination of the length of the secondary section track with one primary section
5.2 Configuring workflow
).
P,AKT,H
then results from
P,AKT,H
Configuration
117

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents