8.5
Starting the burner
For further commissioning steps, follow the sequence of
burner commissioning. For this, it is essential that you
observe the
burner documentation.
8.6
Installing the burner cover
B Hook the burner cover into the hooks of the boiler
casing.
B Secure the burner cover with both lateral screws.
RISK TO LIFE
from electricity.
B Only operate the boiler with its cover fit-
ted.
8.7
Setting the programming
unit/control unit
B Check and make sure that the following settings on
the programming unit are set:
•
Automatic operating mode
•
Required room temperature
•
Required DHW temperature
•
Required heating program
USER INFORMATION
B For information regarding the operati-
on, e.g. selection of temperatures, see
the
documents for the programming
unit.
After completion of the commissioning steps
B Set both rotary selectors on the control unit to "AUT"
(automatic mode). The programming unit takes con-
trol of the panel in this setting.
Logano GB125 oil condensing boiler - Technical specifications are subject to change without prior notice.
Commissioning the heating system
Fig. 38 Fitting the burner cover
Fig. 39 Programming unit (e.g. RC35, with flap open)
Fig. 40 Setting the control unit
8
7 747 011 453-17.1RS