Siemens SINAMICS G110D Operating Instructions Manual page 70

Distributed converter
Hide thumbs Also See for SINAMICS G110D:
Table of Contents

Advertisement

Commissioning
5.6 Commissioning with STARTER
Commissioning procedure
Once STARTER is running it will present an empty screen - from the File menu selected new
project.
Image 5-3
Click OK and the dialog disappears and the normal STARTER screen appears with the
project name appears in the project tree on the right-hand side of the screen.
Image 5-4
Double-click the "Insert single drive unit"; the select drive dialog appears.
70
Create new project dialog
Insert drive
Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
SINAMICS G110D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents