Commissioning; Typical Commissioning Scenarios - Siemens SINAMICS G110D Operating Instructions Manual

Distributed converter
Hide thumbs Also See for SINAMICS G110D:
Table of Contents

Advertisement

Commissioning

5.1

Typical commissioning scenarios

Alternative commissioning options
The functions of the Inverter are activated and configured using parameters. Parameters can
either be accessed from the operator control/display instrument (Operator Panel) or using
the STARTER software from the PC using the appropriate Inverter interface.
Parameter information and data can also be accessed and modified over the AS-interface.
For further details please see the section "Operation in fieldbus system".
Inverters can also be parameterized by saving the valid Inverter parameter set on an SD
memory card then transferring it to a different Inverter with the same configuration and
function.
The commissioning scenarios listed below are described in the following sections:
● Commissioning, using the factory settings
● Commissioning with the STARTER software
● Commissioning using the Operator Panel
● Data backup with the SD memory card
SINAMICS G110D
Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
5
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents