Agilent Technologies 35670A Installation Manual page 42

Hide thumbs Also See for 35670A:
Table of Contents

Advertisement

Preparing the Analyzer for Use
To do the incoming inspection
3
Check that the correct fuses are installed in the fuse holders.
An 8 amp, 250 volt, normal blow fuse is required for ac operation. A 30 amp, 32 volt,
normal blow fuse is required for dc operation. Both fuses are installed at the factory.
For instructions on removing the fuses or fuse part numbers, see ''To change the
fuses.''
4
Using the supplied power cord, connect the analyzer to an appropriate receptacle.
The analyzer is shipped with a three-conductor power cord that grounds the analyzer
when plugged into an appropriate receptacle. The type of power cable plug shipped
with each analyzer depends on the country of destination.
5
Set the analyzer's power switch to on.
Press the switch located on the analyzer's lower left-hand corner. The switch is in the
on ( l ) position when in the ''in'' position. The analyzer requires about 20 seconds to
complete its power-on routine.
6
Test the electrical performance of the analyzer using the operation verification or the
performance tests in chapter 3, ''Verifying Specifications.''
The operation verification tests verify the basic operating integrity of the analyzer;
these tests take about 1
The performance tests verify that the analyzer meets all the performance
specifications; these tests take about 2
2-6
1
hours to complete and are a subset of the performance tests.
2
1
hours to complete.
2
Agilent 35670A

Advertisement

Table of Contents
loading

Table of Contents