Omron NV Series Setup Manual page 74

Programmable
Hide thumbs Also See for NV Series:
Table of Contents

Advertisement

Installing the PT
Note
Note
54
3. Installing the PT
• Installing the NV3W
Used the enclosed mounting brackets (4) and mounting screws (4) to
secure the PT to the mounting panel.
• Installing the NV3W-V1/NV4W
Secure the PT to the panel using the mounting brackets (4) and mounting
screws (4) that came with the PT.
The mounting screws for the NV3W-V1/NV4W are not commercially available.
The waterproofing performance may decrease or other problems occur if
screws other than the special mounting screws are used.
• Installing the NV3Q
Used the enclosed mounting brackets (2) and mounting screws (4) to
secure the PT to the mounting panel.
Mounting bracket
Mounting panel
(1) The PT must be installed in a control panel.
(2) When preparing the panel, do not let metal debris enter the PT.
(3) The panel on which the PT is installed must have a thickness of 1.6 to
4.8 mm. To maintain waterproof and dust proof performance, the mount-
ing bracket screws must be tightened evenly to an appropriate torque.
If the bracket is tightened beyond the specified torque, or if the tightening
is not applied evenly, it may cause warping of the front sheet.
The panel must also be free of dirt and warping, and must be sufficiently
strong enough to support the PT.
(4) Always replace the Waterproof Packing when remounting the PT.
Enlarged
View
Enlarged View
Insert the screws
all the way.
Mounting screws
Slits (on entire
circumference of PT)
Section 4-1
Flat-blade
screwdriver
Be careful of the
mounting screw
direction.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nv3w-v1 seriesNv3w seriesNv3q seriesNv4w seriesNv3wNv4w ... Show all

Table of Contents