7.6

Inspection and maintenance reports

z Sign all inspection work as completed and enter the
relevant date.
Inspection work
1.
Check the general condition of the heating system
2.
Visual and functional check of the heating system
3.
Check all the gas and water components of the system
for:
– Leaks during operation
– Leak test
– Visible signs of corrosion
– Signs of ageing
4.
Check the combustion chamber and heating surfaces
for contamination. Shut down the system first.
5.
Check the burner (see burner documentation)
6.
Check the flue gas pipe for proper functioning and
safety (see burner documentation)
7.
Check water pressure and inlet pressure of the
diaphragm expansion vessel on sealed heating systems
8.
Check water pressure and inlet pressure on open
heating systems
9.
Check the DHW cylinder and corrosion protection
anode for proper functioning (see DHW cylinder
documentation)
10.
Check the control panel setting (see control panel
documentation)
11.
Record the final checks of the inspection work, incl.
measurements and test results
Confirm the professional inspection
Tab. 15 Inspection report
If during inspection work conditions are
identified that require maintenance, this must
be carried out on an as-required basis. If the
water level is topped up, the quality of the
water must correspond to that noted in the
enclosed operator's log.
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Heating system inspection and maintenance
The inspection and maintenance reports are also
designed as templates.
Page
Date:______
48
49ff.
49ff.
Company
stamp/
signature
Date:______
Date:______
Company
Company
stamp/
stamp/
signature
signature
7
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents