Joining The Boiler Block Assembly - Buderus Logano GE615 Installation And Maintenance Instructions Manual

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

4.4.2

Joining the boiler block assembly

Preparation of boiler sections
z Remove nuts and washers from the studs on the hubs
of the boiler sections before attaching the rear section
and front section.
V Put the rear section in place and prevent from falling
over using the installation aid (Æ see Fig. 7 and sepa-
rate installation aid instructions).
z File down any burrs on the hubs.
z Clean the packing grooves where required using a wire
brush and cloth.
Caution: Risk of burning
through flammable solvents.
z Observe the cleaning agent safety
instructions.
z When using cleaning agents, avoid naked
flames, incandescence and sparks.
z Clean the hub sealing faces with a rag soaked in white
spirit.
z Evenly coat the hub sealing faces with red lead putty.
The next step involves preparing the nipples
that will eventually seal the boiler sections.
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Fig 8
Deburring the hub
Fig 9
Coating the hub sealing faces
1
Upper hub sealing face
2
Lower hub sealing face
3
Packing groove
4
Installation
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents