4

Installation

4.1

Checking delivery for completeness

The boiler can be delivered either as a pre-assembled
block or in loose sections.
z After delivery, check all packaging for perfect
condition.
z Check that the delivery is complete.
4.1.1

Delivery as a pre-assembled block

Component
Boiler block
Fittings
Parts
Casing Pack A
Casing Pack B
Insulation
Tab. 5 Scope of supply (pre-assembled block)
4.1.2

Delivery in loose sections

Component
Front, rear, central sections with upper
flow connection and burner door
Central sections (depending on boiler
size)
Base unit fittings, 9 – 16
sections
Supplementary fittings (contents
depend on the size of the boiler)
Parts
Casing Pack A
Casing Pack B
Insulation
Anchor rod set with spring packs
Tab. 6 Scope of supply (loose sections)
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Piece
Packa
ging
1
Pallet
1
Case
1
Case
1
Case
1
Case
1
Foil bag
Piece
Packa
ging
1
Pallet
2 – 5
Pallet
1
Case
1
Case
1
Case
1
Case
1
Case
1
Foil bag
4