Installation

4.11 Installing fittings and burner door (delivery in loose sections)

If delivered as a pre-assembled block, the burner door,
flue gas header and two clean-out covers are already
installed.

4.11.1 Positioning the flue gas header

The GP packing cord (fibre glass cord with silicon casing)
is used to seal the joint between boiler and flue gas
header.
z Stick the GP packing cord (approx. 1500 mm long)
into the groove on the rear section using Silastik
adhesive.
z Insert the packing cord in such a way that the packing
cord joint is in the upper part of the groove.
z Place the flue gas header onto the four threaded studs
on the rear section and secure using washers and nuts.

4.11.2 Screwing clean-out cover onto rear section

Fig. 28 shows the fully equipped rear section with the
clean-out covers on the flue gas header and the clean-out
covers on the rear section.
z Stick the GP10 packing cord (approx. 800 mm long) in
the groove on the rear section using Silastik adhesive
(packing cord joint at the top).
z Secure the clean-out covers on the rear section with
washers and nuts.
24
Fig 27 Positioning the flue gas header
1
2
3
4
5
6
Fig 28 Securing the clean-out covers
1
2
3
4
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Packing cord joint in the upper part of the groove
Packing cord
Flue gas header
Studs
Rear section
Studs
Clean-out cover on the flue gas header
Clean-out cover on the flue gas header
Clean-out cover on the rear section
Clean-out cover on the rear section