4.10 Boiler water connections

Observe the following note regarding the boiler
connection to the pipework. These notes are important for
fault-free operation.
Caution: System damage
through leaking connections.
z Secure the supply pipes free of stress to
the boiler connections.
z Make sure the customer has a WRAS
approved method for filling the system.
Caution: System damage
caused by deposits, local overheating, noise
and corrosion.
z Flush the existing heating system
thoroughly before the boiler is connected
to the pipework.
z To prevent boiler damage we recommend
a desludging unit to be incorporated into
the heating system return.
The weld neck flange (with welded-on pipe) is fitted to the
upper boiler hub if the return is connected at a later stage.
The weld neck flange and flat gasket are shown in Fig. 27.
z The flow connection flange is required for connecting
the flow at a later stage.
A boiler safety set is available on request.
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Fig. 26 Fitting a connection flange
1
Flow connection flange
2
Flat gasket
3
Upper boiler hub (return connection)
4
Flat gasket
5
Weld neck flange
4
Installation
23

Hide quick links: