Inspection And Maintenance Reports - Buderus 600 - 11S Installation And Servicing Instructions

Hide thumbs Also See for 600 - 11S:
Table of Contents

Advertisement

8
Reports
8.2

Inspection and maintenance reports

The inspection and maintenance reports provide an overview
of all the tasks and operations carried out.
See also Section 3: "Inspection" on page 30 or Section 4:
"Maintenance" on page 31.
Inspection tasks
1.
Check general state of system
2.
Visual inspection and function check of system
3.
Check gas- and water-bearing components for
- leaks
- signs of corrosion
- signs of ageing
4.
Take system out of service and check the burner, heat exchanger
and siphon for signs of dirt and soiling.
(See section 4.1.1 on page 31)
5.
Check the burner, hot surface ignitor and ionisation electrode,
after disconnecting the system.
(See section 4.1.1 on page 31)
6.
Measuring the ionisation current
(See section 2.1.15 on page 28)
7.
Measure the gas connection pressure (flow pressure)
(See section 2.1.11 on page 27)
8.
Check the gas-air ratio
(See section 2.1.12 on page 27)
9.
Gas leak test in operational condition
(See section 2.1.2 on page 23)
10. Measure the carbon monoxide content (CO), vacuum
(See section 2.1.14 on page 28)
11. Pressure-testing of heating system:
- admission pressure of expansion tank
(see installation instructions supplied with expansion tank)
- Filling pressure
12. Check ventilation and exhaust conduits for correct functioning and
safety
13. Check requirement-related adjustment settings of control device
(see documentation supplied with control device)
14. Final check of inspection tasks,
with record kept of measurement readings and test results
15. Confirm inspection carried out by qualified service engineer
and fill out the Benchmark
Company stamp / Date / Signature)
Subject to modifications resulting from technical improvements!
66
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 11S/19S/24S/24C • 05/2004
Please check off the inspection and/or requirement-related
maintenance tasks carried out and enter the corresponding
readings.
Sign details of inspection and maintenance tasks,
indicating date carried out.
Use only original replacement parts.
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar
Boulter Buderus Ltd. • http://www.boulter-buderus.co.uk
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar