BodyCraft GXP Assembly Instruction Manual page 15

Gxp strength training system
Hide thumbs Also See for GXP:
Table of Contents

Advertisement

STEP 7 INSTALL CONNECT CABLE
Threaded End
1. Screw one threaded end of the Connect Cable (68) into the Adj. Floating Pulley
Block (23) about half way as Fig. C1. Then run cable up and around pulley C2
mounted on the bottom of the Double Pulley Block (22), using 3/8" X 30.5 L Flat Pin
Bolt (122) and one M6 X 12L Male Screw (124) as Fig. C2. Continue routing the
cable through the steel loop on the Adj. Floating Pulley Block (23) and down to screw
the end into the threaded receptor welded on the base of the Main Frame (1). The
threaded ends of the cable are adjustment points, but should always have at least
one third of the threads screwed into the receptors. When all cable are strung and
cable are adjusted, make sure to tighten the jam nuts.
C2
C3
CONNECT CABLE (68)
C1
Threaded End
14
23
C1
T10
22
122
124
76
C2
1
C3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents