Main unit
8
Operation panel lever assembly attachment
1. Insert the operation panel holder into the groove 1 on the operation panel
final assembly to attach the operation panel final assembly to the operation
panel holder.
2. Tighten the 4 screws (1 2, 2 each).
1
2
3 - 8
Operation panel
Taptite, Cup B
M4X14
Color; Silver
Screw, Bind
M4X4
Color; Silver
Torque
0.78 – 1.18 N-m
Torque
1.18 – 1.57 N-m
1
1
2