Operation Panel Lever Disassembly (Step 1) - Brother PR600 Service Manual

Professional embroidery machine
Hide thumbs Also See for PR600:
Table of Contents

Advertisement

Main unit
5

Operation panel lever disassembly (Step 1)

1. Remove the thumb bolt (M4 L) 1, spring washer (2-4), and plain washer
(M4). (2 locations)
2. Remove the retaining ring E6 inside the operation panel lever A, and then
remove the operation panel holder shaft.
3. Remove the retaining ring E6 from the operation panel holder shaft.
4. Remove the operation panel holder 2 from the operation panel lever A.
6
Operation panel lever disassembly (Step 2)
1. Remove the thumb bolt (M4 L) 1, spring washer (2-4), and plain washer
(M4). (3 locations)
2. Remove the retaining ring E6, and then remove the operation panel level
shaft. (2 locations)
3. Remove the operation panel lever A 2 and the operation panel lever C 3
from the operation panel lever B.
2 - 76
Operation panel
Retaining ring E6
1
2
1
1
2
1
3

Advertisement

Table of Contents
loading

Table of Contents