CAMSHAFT INSPECTION
1. Thoroughly clean the cam shaft.
2. Visually inspect each cam lobe for wear, chafing
or damage.
Lobe height
3. Measure height of each cam lobe using a
micrometer. Compare to specifications.
Cam Lobe Height (Intake & Exhaust):
Std: 1.3334"
(33.8674 mm)
4. Measure camshaft journal outside diameters
(O.D.)
Journal O.D.'s
A
5. Measure ID of camshaft journal bores.
6. Calculate oil clearance by subtracting journal
NOTE: Replace camshaft if damaged or if any part
is worn past the service limit.
NOTE: Replace engine block if camshaft journal
bores are damaged or worn excessively.
ENGINE CRANKCASE
REASSEMBLY
WARNING: After any reassembly or
rebuild, the engine must be primed using
C
the Oil Priming Adapter (PU- - 45778) and
a 3/4- -full oil filter before initial start- -up.
B
Follow Steps 45- -46 in this section to
properly prime the engine and to help aid
proper engine break in.
NOTE:
holes with Primer N (PN 2870585) to remove any
debris. This will ensure proper sealing when installing
bolts.
Camshaft Journal O.D. :
A. (Mag): 1.654" ± .00039" (42 ± .010 mm)
B. (Ctr.): 1.634" ± .00039" (41.50 ± .010 mm)
C. (PTO): 1.614" ± .00039" (41 ± .010 mm)
Camshaft Journal Bore I.D.:
(Mag): 1.656" ± 0.00039" (42.07 ± 0.010 mm)
(Ctr.) 1.637" ± 0.00039" (41.58 ± 0.010 mm)
(PTO) 1.617" ± 0.00039" (41.07 ± 0.010 mm)
O.D.'s from journal bore I.D.'s.
specifications.
Camshaft Oil Clearance:
Std: 0.0027" (.070mm)
Limit: .0039" (.10 mm)
Before assembly, clean the bolts and bolt
ENGINE
Compare to
3.47