Hot Starter Lever Installation - Suzuki RM-Z250 Owner's Manual

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

5-18 SERVICING INFORMATION

HOT STARTER LEVER INSTALLATION

*1
Pass the hot starter cable into the lever cover.
*2
Connect the hot starter cable to the master cylinder holder and hot starter lever.
*3
Pass the hot starter lever into the lever cover.
Tighten the lower bolt first temporarily to provide clearance on the upper side and then tighten both the bolts to
*4
the specified torque.
*5
Install the cover of hot starter lever firmly. Be careful not to damage the lever cover when installing.
ITEM
N·m
kgf-m
A
12
1.2
B
10
1.0
*5
*1
*2
lbf-ft
8.5
7.0
*3
*4

Advertisement

Table of Contents
loading

Table of Contents