Suzuki RM-Z250 Owner's Manual page 89

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

• Install the clip A, washer B and cotter pin C.
NOTE:
Replace the cotter pin C with a new one.
• Install the kick starter lever D in the correct position.
(4-44)
• Tighten the kick starter lever bolt E to the specified torque.
 Kick starter lever bolt: 29 N·m (2.9 kgf-m, 21.0 lbf-ft)
• Install the ignition coil/plug cap F securely. (2-8)
NOTE:
The coupler of ignition coil/plug cap faces backward.
• Fit the projection F of the throttle body to the depression of
intake pipe.
• Position the clamps G correctly. (5-12)
• Install the condenser H.
• Align the matching mark G on the clutch cable I with the
matching mark H on the clutch cable bracket.
• Tighten the clutch cable bracket bolt J to the specified
torque.
 Clutch cable bracket bolt: 6 N·m (0.6 kgf-m, 4.5 lbf-ft)
DISASSEMBLY AND ASSEMBLY 4-9
a 90°

Advertisement

Table of Contents
loading

Table of Contents