Suzuki RM-Z250 Owner's Manual page 166

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

4-86 DISASSEMBLY AND ASSEMBLY
• Insert the push rod A into the inner rod.
• Replace the O-ring with a new one.
• Apply fork oil to the O-ring.
shaped projection A of center bolt B into the
• Insert the
push rod B.
• Slowly tighten the center bolt B until resistance is felt and
check the clearance between the lock-nut 7 and center bolt
B to provide 1 mm (0.04 in) and more C.
• Turn the lock-nut 7 counterclockwise until it contacts with the
center bolt B.
• With the lock-nut 7 held immovable using a wrench, tighten
the lock-nut/center bolt B to the specified torque.
 Lock-nut/center bolt: 22 N·m (2.2 kgf-m, 16.0 lbf-ft)
• With the outer tube compressed by hands, remove the special
tool.
• Tighten the center bolt B to the specified torque.
 Center bolt: 69 N·m (6.9 kgf-m, 50.0 lbf-ft)
C 1 mm (0.04 in) and more

Advertisement

Table of Contents
loading

Table of Contents