Installation Procedure Flowchart; Unpacking The Subsystem - Infortrend EonStor S12S-R1032 Installation And Hardware Reference Manual

Table of Contents

Advertisement

2.4.1

Installation Procedure Flowchart

Figure 2-2 shows a flowchart of the installation procedure. As you
complete each step, check off the "Done" box on the right. Please
use this flowchart in conjunction with the instructions that follow.
2.5

Unpacking the Subsystem

Compare the Unpacking List against the actual package contents to
confirm that all required materials have arrived. Carefully check the
items contained in each box before proceeding with installation.
Do not rely on the non-definitive, summarized unpacking list shown
below- it is for reference only. A detailed packing list can be found
in your product shipping package or product CD.
Each shipping package is divided into the upper and lower levels.
Upper level box contents:
Lower level contents:
Three (3) boxes are placed in the lower level. One (1) box contains
the enclosure chassis with all the pre-installed components. The
other two (2) boxes contain the power cords and accessory items.
Accessory items include an RS-232C serial cable, null modem,
Quick Installation Guide, screws, and a CD containing the
Unpacking the Subsystem
Figure 2-2: Installation Flowchart
WARNING!
twelve (12) drive canisters
Chapter 2: Hardware Installation
2-7