Power On Procedure - Infortrend EonStor GSe Pro 1000 Series Hardware Manual

Hide thumbs Also See for EonStor GSe Pro 1000 Series:
Table of Contents

Advertisement

Power on Procedure

To power on the system please follow the procedures below.
1. Turn on the power switches to the "on" position for every PSU (shown in blue).
2. Power on the networking devices, e.g. switches.
3. Power on the host computers. They should be the last devices to be turned on.
NOTE
Make sure all power supply modules' switches are turned on!
1U model
2U model
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eonstor gse pro 1004Eonstor gse pro 1008

Table of Contents