Oracle Sun SPARC Enterprise M3000 Reference Manual page 378

Xscf reference manual for xcp version 109x
Hide thumbs Also See for Sun SPARC Enterprise M3000:
Table of Contents

Advertisement

showdcl(8)
360
SPARC Enterprise Mx000 Servers XSCF Reference Manual • Last Revised September 2008
Domain status. One of the following status is displayed.
Status
Additional information may be displayed.
Powered Off
Panic State
Shutdown Started
Initialization Phase
OpenBoot Executing Completed
Booting/OpenBoot PROM prompt
Running
Power is off.
A panic occurred, and the domain is in the reboot state.
The power-off process is starting.
OpenBoot PROM initialization is in progress.
The system is in the OpenBoot PROM (ok prompt) state.
The Solaris OS is booting. Or due to the domain shutdown or
reboot, the system is in the OpenBoot PROM running state or is
suspended in the OpenBoot PROM (ok prompt) state.
The Solaris OS is running.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun SPARC Enterprise M3000 and is the answer not in the manual?

Table of Contents