Mitsubishi Electric Freqrol-A100 Instruction Manual page 139

Freqrol-a100 series transistorized inverter for variable torque loads
Table of Contents

Advertisement

4.4 PROGRAMMED OPERATION FUNCTION
I
In programmed operation, automatic operation is performed under the control
of the internal timer in accordance with the desired time' of day, running
frequency and direction of rotation set in advance.
I
L
4.4.1
Preparation
Setting of operation mode
To perform programmed operation, set "5" (programmed opera-
and output terminals
tion) in Pr. 79 "operation mode selection" and
"3"
(programmed
(Pr. 79, Pr. 76)
operation output) in Pr. 76 "alarm code output selection".
Wiring
Inverter
U
v
W
Programmed operation
I
Note:
With
5
set in Pr.
79
and with-
select
out the FR-EPD, the termi-
Timer reset signal
nals operate as indicated on
the left.
OL
IPF
With 3 set in Pr. 76, the
su
terminals operate as indi-
SE
When "5" (programmed operation) is set in Pr. 79, the following
terminals are made valid and invalid and are used for pro-
grammed operation:
I
I
JOG
I
Note: When the battery pack for programmed operation (FR-
EPD) is fitted, note that the terminals used for pro-
grammed operation are not as indicated on the left. (For
details, see the option instruction manual.)
-
-
- -
During programmed operation, the inverter cannot be operated in
any other operation mode. When the programmed operation start
signal (STF) and timer reset signal (STR) are ON, the operation
mode cannot be switched between PU operation and external
operation. When "5" is set in Pr. 79, the following functions are
unavailable if the corresponding inboard option is fitted:
(1)12-bit digital input
(2) PI control

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Freqrol fr-a120eFreqrol fr-a140e

Table of Contents