Exhaust Regeneration Process; Collecting Refuse; Planning Your Route; Refuse Collection Procedure - Wittke Pendulum Operator's Manual

Table of Contents

Advertisement

Exhaust Regeneration Process

To get more details about exhaust regeneration process, please refer to the chassis manufacturer's
documentation.
: During the exhaust regeneration process, the operator must raise the arms until they rest on
N
OTE
the rubber bump stops. Failure to do so will cause damage that are not covered by warranty.

Collecting Refuse

You should carefully follow the instructions below to ensure a safe and efficient collection. All the
safety notions mentioned herein are of outmost importance and you should obey them at all times.
Danger!
Be sure there is enough clearance to handle the container safely from the way up to the way
down. Make sure nobody is near the vehicle.

Planning your Route

It is important to plan your route in order to be efficient. Planning your route will shorten your
collection time and prevent from being caught in a traffic jam.

Refuse Collection Procedure

To collect refuse with your W
Turn on the hydraulic system (See Pump Switch on page 58) and fully open the top door (See
1.
Top Door Switches (Roof Open/Roof Close) on page 64).
Closed top door
P
™ unit, do the following:
ITTKE
ENDULUM
Operating the W
P
ITTKE
ENDULUM
Open top door
™ 81

Advertisement

Table of Contents
loading

Related Products for Wittke Pendulum

Table of Contents