AT&T Synapse Installation Manual page 43

Ip pbx
Hide thumbs Also See for Synapse:
Table of Contents

Advertisement

Synapse Installation Guide
To install the Gateway: (Continued)
The Gateway takes about a minute to power up.
After another Synapse device is installed, and after the Gateway has found the network
and the other Synapse device, Synchronized appears on the third line of the display, as
shown in Figure 21. This is the Idle screen.
The time and date may not be correct. You can set the time and date on the System Basic
PSTN Gateway
Settings page in the WebUI or using the Deskset Admin Settings menu. For more
information, see the Synapse Administrator's Guide.
T1 Gateway
Figure 21. Synchronized
Installation
42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents