Replacing Memory Modules; Required Tools; Preliminary Steps - Fujitsu Primergy CX270 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for Primergy CX270 S2:
Table of Contents

Advertisement

Main memory
7.4

Replacing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
Average software task duration: 5 minutes
7.4.1

Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Replacing memory modules: tool-less
7.4.2

Preliminary steps

Perform the following steps:
"Installing the memory slot air ducts" on page 51
Ê
"Installing the air duct brackets" on page 53
Ê
"Installing the GPGPU riser module" on page 54
Ê
"Installing the air duct" on page 55
Ê
"Installing a TESLA GPGPU card" on page 130
Ê
"Installing the cables" on page 57
Ê
I
For a complete cabling overview, please refer to section
overview" on page
"Connecting the BBU to the controller" on page 213
Ê
"Installing the server node in the server enclosure" on page 62
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 63
Ê
234
304.
Upgrade and Maintenance Manual
(if applicable)
"Cabling
(if applicable)
CX270 S2

Advertisement

Table of Contents
loading

Table of Contents