Installing Expansion Cards; Required Tools; Preliminary Steps - Fujitsu Primergy CX270 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for Primergy CX270 S2:
Table of Contents

Advertisement

Expansion cards, interposer boards and battery backup units
6.3.1

Installing expansion cards

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
6.3.1.1

Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Installing expansion cards:
– Phillips PH2 / (+) No. 2 screw driver
6.3.1.2

Preliminary steps

Perform the following steps:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 43
Ê
"Removing the server node from the server enclosure" on page 44
Ê
"Removing the cables" on page 45
Ê
"Removing the riser module" on page 58
Ê
"Removing SAS RAID controller" on page 124
Ê
CX270 S2
(if applicable)
Upgrade and Maintenance Manual
(if applicable)
103

Advertisement

Table of Contents
loading

Table of Contents