Fujitsu Primergy CX270 S2 Upgrade And Maintenance Manual page 257

Server node
Hide thumbs Also See for Primergy CX270 S2:
Table of Contents

Advertisement

Figure 175: Installing the heat sink CPU1 (A)
Ê Carefully seat the heat sink on the four threaded holes as shown.
V
CAUTION!
– Ensure that the screws on the heat sink are properly seated on the
threaded holes (see circles).
– Ensure that the heat sink cooling fins match the direction of the
airflow!
CX270 S2
Upgrade and Maintenance Manual
Processors
257

Advertisement

Table of Contents
loading

Table of Contents