After A Host Power-On Instruction Is Executed From Ilom, The Post May Not Start, And Processing May Not Go To Os Boot Processing Or The Ok Prompt (Cr 6752910) - Fujitsu SPARC Enterprise T5120 Product Notes

Sparc enterprise servers
Hide thumbs Also See for SPARC Enterprise T5120:
Table of Contents

Advertisement

After a Host Power-On Instruction is Executed
from ILOM, the POST May Not Start, and
Processing May Not Go to OS Boot Processing or
the ok Prompt (CR 6752910)
After a host power-on instruction is executed from ILOM, the POST (self-diagnostics
test) may not start, and processing may not go to OS boot processing or the ok
Prompt for OpenBoot PROM (OBP).
[ILOM command interface operation example]
-> start /SYS
-> start /SP/console
Are you sure you want to start /SP/console (y/n)? y
Serial console started.
[ALOM CMT compatibility shell operation example]
sc> poweron
sc> console
Enter #. to return to ALOM.
Nothing is displayed on the OS console. Entering the escape character "#" restores
the ILOM prompt. The result of the Domain Status may vary. No power-on log item
has been recorded in the event log.
showplatform command and showlogs command domain status reference
example:
sc> showplatform
SUNW,SPARC-Enterprise-T5120
Domain Status
------ ------
S0
Powered off
initializing", "Unknown" etc.
sc>
sc> showlogs -p p
Log entries since Sep 29 12:45:39
----------------------------------
Sep 29 12:45:39: Chassis |major
Sep 29 12:49:28: Chassis |major
Sep 29 12:49:43: Chassis |critical: "Host has been powered off"
* Domain Status : "Powered on", "Powered off", "OpenBoot
: "Host has been powered on"
: "Host is running"
To stop, type #.
Chapter 3
Known Issues
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5220

Table of Contents