Toshiba DP80F Operator's Manual page 233

Plain paper facsimile
Hide thumbs Also See for DP80F:
Table of Contents

Advertisement

ADF TEST - continued
4
Completed the
ADF TEST
The word "OPERATION COM-
PLETED" is displayed on the
screen and the unit returns to
the
individual
test
selection
screen.
The result of the ADF test can
be confirmed with the self test
report. To print the self test re-
port, refer to "PRINTING A
TEST RESULT" on page 239.
If the result of the ADF test is
judged to be NG, call your ser-
vice representative.
231

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp85f

Table of Contents