AMX Enova DGX 8 Instruction Manual page 43

Enova dgx digital media switchers
Hide thumbs Also See for Enova DGX 8:
Table of Contents

Advertisement

FIG. 23
Power setup for complete redundancy on Enova DGX 32
Caution: We recommend attaching all power cords to a surge protector and/or an AC line conditioner.
Power-Up Sequence
Note:
Enova DGX 64 only
system meets or exceeds the radiated emission requirements defined in standards EN55022:2010,
FCC 15.109(g):2014, and ICES-003:2012. To install these filters, clamp in place onto the power cords as
close to the power supply as reasonably possible for the system.
Important:
control panel will continue to operate. However, input and output boards will become inoperable and the
system will not send or receive signals until at least three power supplies resume functional status.
The following instructions start with attaching only two source and destination devices for the purpose of executing a
test switch (after the factory default switch is disconnected).
To apply power:
1.
Attach the first two source and destination devices (attach the remaining devices in Step 11 after executing the test
switch in Step 10).
Do not apply power to the source and destination devices until Step 8.



2.
Optional – Attach an external control device/system (see page 59).
Instruction Manual – Enova DGX 8/16/32/64 Digital Media Switchers
– Four AC power filtering Ferrites (one per cord) are provided to ensure the
Enova DGX 64 only
– If two or more power supplies are not receiving power, the CPU and the
If connecting devices to DXLink Twisted Pair Boards, the boards require DXLink HDMI Transmitters and
Receivers. Install the Transmitters and Receivers between the first two source and/or destination devices
and the DXLink Boards (see "System Setup with DXLink™ Transmitters and Receivers" on page 87 and
the product's documentation).
If connecting devices to DXLink Fiber Boards, the boards require DXLink Fiber Transmitters and
Receivers. Install the Transmitters and Receivers between the first two source and/or destination devices
and the DXLink Fiber Boards (see "System Setup with DXLink™ Fiber, Duplex Units" on page 105 and the
product's documentation).
If connecting devices to SC Optical Boards, the boards require DGX Fiber Modules. Install the modules
for the first two source and/or destination devices and then connect the modules to the SC Optical Boards
(see "System Setup with DGX Fiber Modules" on page 116 and the module's documentation).
Installation and Setup
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents