Appendix 1: Blower Installation - Osburn 2000 Installation And Operation Manual

Table of Contents

Advertisement

  2000 Insert Installation and Operation Manual 
 
APPENDIX 1: BLOWER INSTALLATION 
 
First of all, attach the fan assembly to the insert by sliding the downward rear tabs into the narrow 
slots located on each side below the loading door. (Refer to drawing) 
 
To  assemble  the  ash  lip,  open  wide  the  loading  door  to  allow  enough  space  in  order  to  push  it 
down into the clips located below the loading door opening. Close the door when finished. 
 
46  _ _____________________________________________________________________________   

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 insertOb02011

Table of Contents