3-Pair Station Cable Circuits - Avaya G650 Installing

Avaya media gateway
Hide thumbs Also See for G650:
Table of Contents

Advertisement

3-pair station cable circuits

To determine the size of station cables containing 3-pair circuits, multiply the number of 3-pair circuits
required at the satellite location by 3.5. Then, using the minimum size cable requirement, round up the
cable size requirement to the next highest available cable bundle size. This will provide additional pairs
for growth and compensate for every twenty-fifth pair in a cable that is not used.
4-pair station cable circuits
To determine the size of station cables containing 4-pair circuits, find out how many information outlets
are served by the equipment room MDF or satellite location MDF. Multiply the number of information
outlets by 4. Then, using the minimum size cable requirement, round up the cable size requirement to the
next highest available cable bundle size.
104
NOTE:
This formula may not compensate for the unused 25th pair in all cases. If not, it must be
allowed for.
Installing the Avaya G650 Media Gateway
June 2004

Advertisement

Table of Contents
loading

Table of Contents