Connecting the media gateway to the main distribution frame
Installing connector cables between auxiliary
cabinet (if used) and main distribution frame
Auxiliary equipment that connects to the MDF can be mounted inside the auxiliary cabinet. The
equipment connects to an ED-1E1443-10 (Group 1) intraconnection panel mounted in the cabinet. This
intraconnection panel consists of a 110-type 100-pair wiring block. Auxiliary equipment is connected to
the 110-type wiring block. The wiring block is pre-wired to four 25-pair female connectors mounted on
the outside rear of the cabinet.
To install connector cables between the auxiliary cabinet and the main distribution frame:
1
Install "D" rings on the wall between the cable slack manager and the terminal/connecting blocks
mounted on the MDF.
2
Install a self-sticking port label on the rear of each connector on the B25A connector cable. See
Figure 59, Self-stick label on 25-pair cable connector,
3
Labels should be positioned so the cabinet connector retainers do not obscure them.
4
At the rear of the auxiliary cabinet, connect 1 end of the connector cable to the assigned
connector.
5
Route the cable down the rear of the cabinet and through the cable slack manager to the MDF.
6
At the MDF, connect the other end of the cable to the assigned terminal/connecting block
connector.
7
Store the excess cable in the cable slack manager.
8
Repeat Steps 2 through 6 until all cables are installed.
Figure 59: Self-stick label on 25-pair cable connector
122
on page 122.