Hotfix Configuration Task List - 3Com 4510G Configuration Manual

3com switch 4510g family
Table of Contents

Advertisement

Figure 22-4 Patches are activated
RUNNING state
After you confirm the running of the ACTIVE patches, the state of the patches will become RUNNING
and will be in the RUNNING state after system reboot. For the five patches in
confirm the running the first three patches, their states will change from ACTIVE to RUNNING. At this
time, the patch states of the system are as shown in
Figure 22-5 Patches are running
The patches that are in the RUNNING state will be still in the RUNNING state after system reboot.

Hotfix Configuration Task List

Install patches
Uninstall
patches
Task
One-Step Patch Installation
Step-by-Step Patch Installation
One-Step Patch Uninstallation
Step-by-Step Patch Uninstallation
Figure
22-5.
Use either approach.
The step-by-step patch installation allows you
to control the patch status.
Use either approach.
The step-by-step patch uninstallation allows
you to control the patch status.
22-4
Figure
22-4, if you
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents