Standalone Ups Installation - Eaton Powerware BladeUPS User Manual

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

INSTALLATION

Standalone UPS Installation

NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur to
your equipment and void your warranty.
The BladeUPS models require a dedicated branch circuit that meets the
following requirements:
S
S
S
S
To install the UPS:
1.
2.
NOTE The load connector breaker controls the load connector only, not the output power
cord.
3.
4.
5.
6.
48
EATON Powerware
50A (BladeUPS 12) or 30A (BladeUPS 12i) circuit with overcurrent
protection
Three-phase, 4-wire plus ground, 208Y/120V nominal (BladeUPS 12)
or 400Y/230V nominal, 380–415 Vac acceptable (BladeUPS 12i)
50/60 Hz
The breaker must be wall-mounted and be readily accessible to the
operator
Switch off utility power to the distribution point where the UPS will
be connected. Be absolutely sure there is no power.
Verify that all circuit breakers are in the OFF (O) position.
If you are installing power management software, connect your
computer to the UPS communication port or optional X-Slot card
(see page 89). For the communication port, use the supplied serial
cable.
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw. See Figure 32 for the location of the ground
bonding screw.
If an emergency power-off (disconnect) switch is required by local
codes, see "Remote Emergency Power-off" on page 95 to install
the REPO switch before powering on the UPS.
Continue to "Standalone UPS Initial Startup" on page 66.
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3 www.powerware.com

Advertisement

Table of Contents
loading

Table of Contents