20. If you installed an optional REPO, test the REPO function:
NOTE The batteries charge to 80% capacity in less than 5 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.
21. See "Updating the UPS Firmware" on page 112.

Parallel System Initial Startup

To start up a parallel (or parallel-ready) system:
NOTE Verify that the total equipment ratings do not exceed the parallel system capacity to
prevent an overload alarm.
1.
NOTE The load connector breaker controls the load connector only, not the output power
cord.
2.
3.
4.
5.
6.
7.
8.
68
EATON Powerware
Activate the external REPO switch. Verify the status change on the
UPS display.
Deactivate the external REPO switch and restart the UPS.
Verify that all UPS circuit breakers are in the OFF (O) position.
Switch on utility power where the UPS is connected.
Remove the breaker ties from the circuit breakers.
Switch the UPS input circuit breaker on each UPS to the ON (
position.
Wait for the front panel display on each UPS to illuminate.
The
indicator flashes on each UPS.
Check each UPS front panel display for active alarms or notices
(other than "Batteries Disconnected"). Resolve any active alarms
before continuing. See "Troubleshooting" on page 119.
Switch all UPS battery circuit breakers to the ON (
If optional EBMs are installed, switch all EBM battery circuit
|
breakers to the ON (