Mitsubishi Electric MELSEC Q Series User Manual page 242

Programmable controller multiple cpu system
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(3) When creating a new multiple CPU system
Start-up of GX Developer
Open the PLC parameter setting window
for parameters of GX Developer.
(To next page)
Start
CHAPTER8 STARTING UP THE MULTIPLE CPU SYSTEM
The operating manual of GX Developer.
The operating manual of GX Developer.
Select "PLC system" and display the PLC
system setting window.
Points occupied by empty slot (Option)
Set the occupied points for one empty slot.
Default: 16 points
1
2
3
4
5
6
7
8
8 - 17

Advertisement

Table of Contents
loading

Table of Contents