Set Up and Calibration Procedures
Calibration
Calibration Set up
Follow the steps below to set up the test equipment and actuator to verify calibration or perform calibration
procedures.
Step
Determine input type (current or voltage).
1
Set jumper W2 on main CPU board according to type of signal source. See Figure 27 on page
2
68 for jumper location.
Connect the copper leads from the signal source to the input terminals of the actuator as
3
shown in Figure 25.
Place signal source output at zero and switch power on.
4
Connect a 250 ohm resistor across the Output terminals of the actuator and connect the DVM
5
leads to the terminals.
Calibrated
Signal
Source
+
-
Internal 250 ohm resistor
settable through
Jumper W2

Figure 25 Calibration Wiring Connections (non-slidewire emulation)

66
HercuLine™ 2000 Series Actuator - Installation, Operation and Maintenance Manual
Input
5
Current
Voltage
Action
Actuator
Terminal Block
Output
4
2
1
-
+
-
+
250 ohm
resistor
(supplied)
Digital
Voltmeter
+
-
Revision 6
7/07