Library Installation
Moving or Shipping the Library
Moving or Shipping the Library
To move or ship the library:
1. Properly shut down and power off the host.
2. Remove the cartridges (see software package documentation).
3. Verify that the drives are empty (
4. Turn off the power switch on the front of the library.
5. Remove the back cosmetic panel (lift up on the bottom of the panel, then
6. Remove the power cord and the SCSI cables.
7. Raise the leveler feet (use a 1/2-inch wrench).
8. Transport the library:
CAUTION
The library can be seriously damaged if it is not shipped using appropriate
shipping materials. A service representative can provide assistance or advice
on how to best repackage and ship the library.
9. Lower the leveler feet.
10. Re-install the library. Refer to installation steps 3 through 6 in this
2-10
pull it away).
• To move the library a short distance, carefully roll the library to its
new destination.
• To ship the library, repackage the library in the same materials and
ship it in the same manner in which it was received, then unpack it at
its new destination.
chapter.
displays after the drive number).